Acts
Covenant Fellowship
Township occupancy approval of this building required extensive renovations
for code compliancy. Chapter 12 (compliance alternatives) of the International
Existing Building Code 2003 was used in determining alternate code requirements...
|
 |
Advanced
Trim Specialties
This project required extensive site work, excavation of rock to 14’ below
grade and the export of over 1800 loads, and construction of 1/3 of the
building on compacted fill. An aggressive construction schedule was completed...
|
 |
Conestoga
United Methodist Church
A challenge to this project was to design and construct an addition that
was aesthetically pleasing and blends well with the 140 year old existing
building. The existing building was unapproved...
|
 |
J.
K. Mechanical, Inc.
This construction project including all site work,
building construction, and final occupancy inspection was completed in
4 months and 8 days. The entire building including all warehouse spaces
are heated by a radiant heat system...
|
 |
Mount
Olive Baptist Church
This new construction project is on a site slightly less than 2 acres.
The main floor of 5,980 sq. ft. has a narthex, lavatories, several offices,
audio visual...
|
 |
Stoltzfus
Feed & Supply, Inc.
This building was constructed for warehousing and distribution of feed
and feed products. This stand alone building was added to the property
of the existing business. The 70’-0” wide clear span structure
has a 20’-0” eave height and an interior ceiling...
|
 |
Vietnamese
Alliance Church
S. E. Smoker, Inc. worked with the congregation and selected sub-contractors
to allow the church to self-perform much of the finish work. The civil
plans required disturbance of approximately ...
|
| |